phase 3+

92,000 sq ft Building

Structure Steel frame: precast concrete floors. Insulated render system with composite panel cladding and ribbon windows, with curtain walling to the atrium and the offices immediately above the atrium, where they are complimented by Brises Soleils. Roof – mounted services plant.

  • Parking: 265 car parking spaces in a secure undercroft, 2.1m clear height
  • Floor to Ceiling Height: 2.9m clear
  • Ceiling Void: 550mm (minimum)
  • Floor Void: 140mm minimum clear
  • Lifts: Three ten-person capacity (two serving the undercroft lobby)
  • Atrium: Three storeys in height, including feature staircase
  • Staircases: Atrium feature staircase, one internal fire escape staircase (which can be used as an accommodation stairs) plus two external fire escape cores

Facilities

  • Fully fitted WC’s, shower facilities and disabled facilities; provision for goods lift, loading and refuse collection
  • Cabling: Generous spare duct capacity for future demands, able to accommodate diverse supplies
  • Joinery: Beech (subject to finishes approvals) doors and joinery
  • Landscaping: High quality hard and soft landscaping scheme
  • Additional Certification: BREEAM Very Good Certificate

Finishes

The building is finished to developer’s Category A fit out and includes:

  • Full access raised floors with a 140mm general clear void (fitted)
  • Anti-static carpeting
  • 750mm x 750mm perforated metal ceiling tiles to offices
  • Steamed beech hardwood skirtings to offices
  • Power on a 3m x 3m floor box system, allowing for future accommodation of voice and data wiring
  • Office lighting installed in the spirit of LG7 to enable tenant to achieve full compliance as part of the Category B works
  • Four-pipe fancoil air conditioning (fitted)